Prakash Samaga 

Coastal Talk News | Mangaluru 

Engineering Scale Plan (ESP) for the proposed development of Arebetta railway station as a crossing station on Sakleshpur-Subrahmanya Road ghat section has been approved at the railway headquarters level. The plan, a detailed engineering drawing of the proposed station layout, has been sent to the Commissioner of Railway Safety (CRS) for further processing. Approvals from the CRS and the Railway Board are awaited, sources from the Engineering Department of Mysore Division of South Western Railway said. 

Developing Arebetta railway station as a crossing station is important because will ease a major rail bottleneck and will enable more passenger trains to operate. At present, 55-km Sakleshpur–Subrahmanya Road Western Ghats stretch has limited crossing loops, restricting how many trains can pass through daily. The timeline for executing the project will be decided after final approvals are obtained. Hassan Mangalore Rail Development Company Limited (HMRDCL) has agreed to bear the cost of developing the crossing station, sources said. 

The proposed facility could improve train handling capacity on the newly electrified, single-line ghat section of the Hassan-Mangaluru route. A crossing station will have a loop line alongside the main line, allowing trains travelling in opposite directions to pass each other or a faster train to overtake a slower one. The 55-km Sakleshpur-Subrahmanya Road stretch passes through challenging terrain, with steep gradients, sharp curves, 57 tunnels and more than 250 bridges. Landslide-related constraints also posed challenges along the route. Safety measures undertaken on the section include flattening slopes, installing rockfall barriers and boulder netting, constructing gabion walls and improving side drains.